Friday, Oct 30 | --:--
Back to home

Nvidia Holds the Lease on Anthropic’s Reported $35B Texas Block

Bloomberg and DCD report Anthropic signed about $35 billion of cloud with Nvidia-backed Lambda for roughly 350 MW at Hut 8’s Beacon Point campus in Nueces County, Texas, with Nvidia holding the lease. Anthropic declined comment.

Times of AI Desk 3 min read San Francisco, CA View as Markdown
Engraved Anthropic mark over a Texas map and a Lambda/Nvidia lease plate marked 350 MW, security-intaglio terracotta-green linework. No currency-note layout.

Corrected October 14, 2026: Described Nvidia as holding the lease (per The Wall Street Journal, via DCD), not as landlord; corrected DCD's attribution to the WSJ; removed an unverified $19.6 billion figure and timestamp; turned an internal reference into a link.

Nvidia now holds the lease, not just supplies the chips, on Anthropic’s reported Texas block. Watch for an on-the-record confirm — and whether $35B + $45B in two weeks is one book or two campuses.

Bloomberg and DCD / The Wall Street Journal said Anthropic signed ~$35 billion of cloud with Nvidia-backed Lambda for ~350 MW at Hut 8’s Beacon Point, Nueces County, Texas. Nvidia holds the lease; Lambda deploys Nvidia GPUs. Q1 2027 energization target; campus can scale toward 1 GW. Anthropic declined comment. Hut 8 July leases at the campus already 704 MW. Not the Nscale $45B lease.

Reported terms#

LinkEmbed

Item Bloomberg / DCD Sep 1
Value ~$35B
Power ~350 MW
Lease holder Nvidia (per WSJ, via DCD)
Operator Lambda
Site Hut 8 Beacon Point, TX

Wire-reported; Anthropic declined comment.

Sources#

Prior Coverage

Earlier Times of AI reporting on this thread.

Scroll to continue reading